1

High-Efficiency 400 kW Chiller Installation Delivers £50,000 Yearly Energy Savings and 200 Metric Tonnes CO₂ Reduction

News Discuss 
Project Summary At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation boosts process efficiency while cutting overall power consumption and CO₂ levels. https://newsome.ltd.uk/case-studies/high-efficiency-400-kw-chiller-installation-delivers-50000-annual-energy-savings-and-200-tonnes-co%e2%82%82-reduction/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story