1

Penmann finalises major HVAC upgrade for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann recently finalised a significant HVAC upgrade at Danone Nutricia's Liverpool facility, supplying a fully engineered ventilation and climate control system built to comply with strict hygiene and production criteria. The contract included the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High https://social-lyft.com/story10678997/the-penmann-team-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story