One more Be aware: the favored serpentine route on the Salzberg will continue being shut right until the end of the development operate. Design perform will commence on one September 2025 and can last right until early summer time 2026. All through this time, the salt mine (salt mine) as https://billyy221wof2.mywikiparty.com/user