Originally, the Jai Hind metro station was prepared to become elevated. On the other hand, the AAI objected which the elevated stretch up into the airport may well pose a threat to plane, And so the route was even more reworked plus the station was shifted underground, 150 m from https://railwaygroupdjobs01233.blogrenanda.com/38190475/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf